Import a saved site plan and the hazards, method sequence and scope will be drafted for you to review, adapt and issue. The builder is being finalised and is not open yet.
It will appear here and in the planner's Tools menu when it opens.
Import a saved plan and the hazards, method sequence and scope are drafted from what you actually drew - trenches, containment, supply works, the lot. Review it, adapt it, issue it.
Drafts are written from your site plan as a starting point. Review, adapt and approve every section before issue - responsibility for the risk assessment and the safe system of work stays with you as the duty holder.
These fill the cover and section 1.1 of the printed pack.
One bullet per line - printed as section 1.2, Description of works. Drafted from the plan's quantities.
Quantities out of date? Re-derive from plan in the bar above rewrites this list from the latest saved plan.
The sequence of operations, in install order. One step per line inside each block.
5×5 scoring: likelihood × severity, before and after controls. One control per line.
Baseline PPE for the job and the hazardous substances in use.
One item per line for permits and rules.
Arrangements printed on the emergency page and briefed at sign-on.
One qualification per line. Defaults come from your company profile.
Named operatives print onto the sign-on sheet. Leave blank for a fill-on-site sheet.
Status, revision history and the audit trail for this document.
Draft from a saved plan, or start blank.
Saved once and reused on every RAMS. Stored on this device.
Issuing locks the document at its current revision so it can't be changed after it's sent. Amend later to raise a new revision.
Log the client or principal contractor sign-off for your records.
This reopens the document for editing at {{ nextRevLabel }}. Note what's changing for the revision history.
Add extra items to this document.
| Site address | {{ pSiteAddress }} | Location of works | {{ pLocation }} |
| Client | {{ pClient }} | Project ref | {{ pProjectRef }} |
| Programme dates | {{ pDates }} | Client ref | {{ pClientRef }} |
| Supervisor | {{ pSupervisor }} | Site contact | {{ pSiteContact }} |
| Principal designer | {{ pPd }} | Principal contractor | {{ pPc }} |
| Supply | {{ pSupply }} | Earthing | {{ pEarthing }} |
Risk rating = likelihood (1–5) × severity (1–5). Initial rating assumes no controls; residual rating is with the controls below applied. See the matrix at the end of this section.
| Likelihood → | |||||
| {{ row.sev }} | {{ cell.v }} | ||||
{{ pPpeNote }}
| Substance | Hazard / risk | Controls |
|---|---|---|
| {{ x.s }} | {{ x.r }} | {{ x.ctl }} |
Manufacturers' safety data sheets are held with the site pack.
Welfare: {{ pWelfare }}
| Emergency services | 999 (112 from mobile) |
| Nearest A&E | {{ pEmgAe }} |
| Appointed first aider | {{ pEmgFirstAider }} |
| First aid provision | {{ pEmgKit }} |
| Assembly point | {{ pEmgAssembly }} |
{{ pEmgNotes }}
By signing below I confirm I have read and understood this RAMS, I am briefed on the hazards and control measures, and I agree to work in accordance with it.
| Name | Role | Phone | Signature | Date |
|---|---|---|---|---|
| {{ o.name }} | {{ o.role }} | {{ o.phone }} |
| Rev | Date | Description | By |
|---|---|---|---|
| {{ r.rev }} | {{ r.date }} | {{ r.note }} | {{ r.by }} |