RAMS Builder
Coming soon

Site-specific RAMS, drafted from your plan.

Import a saved site plan and the hazards, method sequence and scope will be drafted for you to review, adapt and issue. The builder is being finalised and is not open yet.

Back to the planner Quotes & invoices

It will appear here and in the planner's Tools menu when it opens.

Planner
Features
RAMS
Site Planner · risk assessments & method statements
RAMS Builder

Site-specific RAMS, drafted from the plan.

Import a saved plan and the hazards, method sequence and scope are drafted from what you actually drew - trenches, containment, supply works, the lot. Review it, adapt it, issue it.

Documents
{{ docCountLabel }}
{{ d.title }}
{{ d.sub }}
Plan moved on
Rev {{ d.rev }}
{{ d.stLabel }}
No RAMS yet
Start from a saved plan - the document drafts itself from your markup.

Drafts are written from your site plan as a starting point. Review, adapt and approve every section before issue - responsibility for the risk assessment and the safe system of work stays with you as the duty holder.

{{ modeLabel }} {{ stLabel }} {{ revLabel }} Plan moved on
{{ lockMsg }}

Project & site details

These fill the cover and section 1.1 of the printed pack.

Scope of works

One bullet per line - printed as section 1.2, Description of works. Drafted from the plan's quantities.

Quantities out of date? Re-derive from plan in the bar above rewrites this list from the latest saved plan.

Method statement

The sequence of operations, in install order. One step per line inside each block.

{{ m.n }} {{ m.whyShow }}

Risk register

5×5 scoring: likelihood × severity, before and after controls. One control per line.

{{ h.n }} {{ h.whyShow }}
Initial {{ h.scoreI }} · {{ h.bandI }}
Residual {{ h.scoreR }} · {{ h.bandR }}

PPE & COSHH

Baseline PPE for the job and the hazardous substances in use.

Minimum PPE on site - tap to toggle
COSHH - substances in use
Controls summary; keep the full SDS with the pack
{{ x.whyShow }}

Permits, site rules & welfare

One item per line for permits and rules.

Emergency & first aid

Arrangements printed on the emergency page and briefed at sign-on.

Training & competence

One qualification per line. Defaults come from your company profile.

Operatives & sign-on

Named operatives print onto the sign-on sheet. Leave blank for a fill-on-site sheet.

Revisions & issue

Status, revision history and the audit trail for this document.

{{ stLabel }} Revision {{ revLabel }}
{{ issueRecord }}
{{ acceptRecord }}
Revision history
Rev {{ r.rev }} {{ r.date }} {{ r.note }} {{ r.by }}
{{ toast }}

New RAMS

Draft from a saved plan, or start blank.

Saved plans on this device
No saved plans found on this device. Save a project in the Site Planner first, or start a blank RAMS below.
Will draft:
{{ importSummary }}
or start blank

Company profile

Saved once and reused on every RAMS. Stored on this device.

Review & issue

Issuing locks the document at its current revision so it can't be changed after it's sent. Amend later to raise a new revision.

{{ issueSummary }}

Record acceptance

Log the client or principal contractor sign-off for your records.

Amend - raise {{ nextRevLabel }}

This reopens the document for editing at {{ nextRevLabel }}. Note what's changing for the revision history.

Library

Add extra items to this document.

{{ i.t }}
{{ i.grp }}
Added
{{ i.t }}
Added
{{ i.t }}
Added
Risk Assessment & Method Statement
{{ pTitle }}
{{ pMode }} · {{ pRefLine }}
{{ pLogoNode }}
{{ pCoName }}
{{ pCoAddress }}
{{ pCoPhone }}
{{ pCoEmail }}
Revision
{{ pRev }}
Status
{{ pStatus }}
Prepared by
{{ pPrepBy }}
{{ pPrepPos }}
Issued
{{ pIssueBy }}
{{ pIssueDate }}
Draft - not issued
1.1 Project & site details
Site address {{ pSiteAddress }} Location of works {{ pLocation }}
Client {{ pClient }} Project ref {{ pProjectRef }}
Programme dates {{ pDates }} Client ref {{ pClientRef }}
Supervisor {{ pSupervisor }} Site contact {{ pSiteContact }}
Principal designer {{ pPd }} Principal contractor {{ pPc }}
Supply {{ pSupply }} Earthing {{ pEarthing }}
1.2 Description of works
  • {{ s.t }}
1.3 Method statement - sequence of works
{{ m.n }} {{ m.t }}
  1. {{ st }}
2. Risk assessment

Risk rating = likelihood (1–5) × severity (1–5). Initial rating assumes no controls; residual rating is with the controls below applied. See the matrix at the end of this section.

{{ h.n }} {{ h.t }}
Initial {{ h.scoreI }} Residual {{ h.scoreR }}
Task: {{ h.task }}
Persons at risk: {{ h.p }}
Hazard: {{ h.hz }}
Control measures
  • {{ c }}
Risk matrix - likelihood × severity
Likelihood →
{{ row.sev }} {{ cell.v }}
1–4 Low - proceed
5–9 Medium - controls required
10–15 High - review before work
16–25 Very high - do not proceed
3. Personal protective equipment
{{ p.label }}

{{ pPpeNote }}

4. COSHH - substances in use
Substance Hazard / risk Controls
{{ x.s }} {{ x.r }} {{ x.ctl }}

Manufacturers' safety data sheets are held with the site pack.

5. Permits, site rules & welfare
Permits to work
  • {{ p.t }}
Site rules
  • {{ r.t }}

Welfare: {{ pWelfare }}

6. Emergency arrangements & first aid
Emergency services 999 (112 from mobile)
Nearest A&E {{ pEmgAe }}
Appointed first aider {{ pEmgFirstAider }}
First aid provision {{ pEmgKit }}
Assembly point {{ pEmgAssembly }}

{{ pEmgNotes }}

7. Training & competence
  • {{ t.t }}
8. Legislation & guidance
Statutory
  • {{ l.t }}
Standards & guidance
  • {{ c.t }}
9. Operative briefing & sign-on

By signing below I confirm I have read and understood this RAMS, I am briefed on the hazards and control measures, and I agree to work in accordance with it.

Name Role Phone Signature Date
{{ o.name }} {{ o.role }} {{ o.phone }}
10. Revision history & approval
Rev Date Description By
{{ r.rev }} {{ r.date }} {{ r.note }} {{ r.by }}
Prepared & issued by
{{ pIssueBy }}
{{ pCoName }} {{ pIssueDate }}
Signature
Client / principal contractor acceptance
{{ pAcceptName }}
{{ pAcceptRole }}
Name / role:
Signature & date
This document is specific to the works and site named above and is valid for this project only. It must be reviewed if the works, site conditions or personnel change. Prepared by {{ pCoName }}. Registered accreditations: {{ pCoAccreds }}. Insurance: {{ pCoInsurer }} - policy {{ pCoPolicy }}.